| LE1 |
Class introduction, Requirements |
|
| LE2 |
Requirements (cont.), Electromagnetic("EM") design |
|
| LA1 |
Team activities |
|
| LE3 |
System management |
Team plans presentations |
| LE4 |
Mission design, Teamwork |
|
| LA2 |
Team activities |
|
| LE5 |
Formation flight control |
Team presentations |
| LA3 |
Team activities |
|
| LE6 |
Trade analyses |
Team presentations |
| LE7 |
Presentation planning |
Individual program report presentations |
| LA4 |
Trade analysis and requirements review ("TARR") preparation |
|
| LE8 |
Sub-system planning, Real-time software |
|
| LA5 |
TARR preparation |
Team progress report presentations |
| LA6 |
TARR preparation |
|
| LA7 |
TARR preparation |
|
| LA8 |
TARR preparation |
|
| LA9 |
TARR dry run |
|
| LE9 |
|
TARR presentation |
| LE10 |
Lab introduction |
Requirements document due |
LE11
LA10 |
Reliability and operations
Sub-system design |
|
| LE12 |
Design document |
|
| LA11 |
Sub-system prototyping |
|
| LA12 |
Sub-system design |
|
| LE13 |
|
Sub-system report presentations |
| LA13 |
Sub-system prototyping |
|
| LE14 |
Manufacture and test |
|
| LA14 |
Sub-system prototyping |
|
| LE15 |
Presentation planning |
|
| LA15 |
Sub-system design |
|
| LA16 |
Sub-system prototyping |
|
| LE16 |
|
Sub-system report presentations |
| LA17 |
Preliminary design review ("PDR") preparation |
|
| LA18 |
Sub-system prototyping |
|
| LE17 |
|
PDR presentations |
| LA19 |
PDR action items |
|
| LA20 |
Design document preparation |
|
| LA21 |
Design document preparation |
|
| LA22 |
Team social |
Design document due |