|
|
|
|
1 |
|
|
|
Campus Tour: Relationships betweeen spaces |
|
|
|
|
|
|
|
2 |
|
|
|
Optimist's Daughter reading; BH demo on drafting, cutting. Make scale figures, build 1/8-scale cube models. Students and TAs talk about choices of designer |
|
|
|
|
|
|
|
3 |
|
|
|
Due: Written statement on choice of designer, facilities; Begin 1/8-scale context model; BH demo on using trace to "surprise yourself" |
|
|
|
|
|
|
|
4 |
|
|
|
South End Field Trip |
|
|
|
|
|
|
|
5 |
|
|
|
Due: 1/8-scale sketch plans, card-stock spaces on context model; BH talk on site attitudes |
|
|
|
|
|
|
|
6 |
|
|
|
Pin-up: First arrangement of work-space "cubes" on 1/8-scale models; BH demo on SketchUp |
|
|
|
|
|
|
|
7 |
|
|
|
Due: First sketch of site apportionment; BH demo on fome-cor; Build 1/16-scale gesture model |
|
|
|
|
|
|
|
8 |
|
|
|
Inter-group Exhibit: SketchUp site images; BH talk on columns as structure and idea |
|
|
|
|
|
|
|
9 |
|
|
|
Carpenter Center tour: Spaces within a structural order |
|
|
|
|
|
|
|
10 |
|
|
|
Due: 1/4-scale plan of site on trace; TA demos on column experience; Column experience on 1/4-scale plans |
|
|
|
|
|
|
|
11 |
|
|
|
Due: First-pass columns on 1/4-scale plans and 1/8-scale models; BH talk on using SketchUp in designs |
|
|
|
|
|
|
|
12 |
|
|
|
Inter-group Pin-up: Second-pass 1/4-scale plans and 1/8-scale models; Class work on beams and planes |
|
|
|
|
|
|
|
13 |
|
|
|
First Mid-Review: 1/4-scale plans and 1/8-scale model showing "heavy," "hollow," and structure |
|
|
|
|
|
|
|
14 |
|
|
|
Photo and advising day; BH talk on spatial zones, organizing plan and site by abstraction |
|
|
|
|
|
|
|
15 |
|
|
|
Due: "Final" 1/4-scale plans; BH talk on 1/2-scale "show" plans and "tectonic nature" of concrete |
|
|
|
|
|
|
|
16 |
|
|
|
Due: 1/2-scale plans; BH demo on concrete formwork and casting; Talk in groups on 1-in-scale Detail Models |
|
|
|
|
|
|
|
17 |
|
|
|
Work in class on concrete formwork |
|
|
|
|
|
|
|
18 |
|
|
|
Second Mid-Review: 1/2-scale plans and 1-in-scale Detail Models |
|
|
|
|
|
|
|
19 |
|
|
|
Photo day; Begin construct 1/2-scale Final Model base |
|
|
|
|
|
|
|
20 |
|
|
|
Due: Completed 1/2-scale model base; BH talk on proportion and openings |
|
|
|
|
|
|
|
21 |
|
|
|
Pin-up: Massing in chip on 1/2-scale final model. Desk crits on opening sketches |
|
|
|
|
|
|
|
22 |
|
|
|
Due: Site "heavy" built in chipboard, "final" massing of studio sketched in chipboard, first-pass openings sketched on trace overlays |
|
|
|
|
|
|
|
23 |
|
|
|
Inter-group Exhibit: "Pre-final" 1/2-scale models |
|
|
|
|
|
|
|
24 |
|
|
|
Last class |
|
|
|
|
|
|
|
25 |
|
|
|
Final Review: With faculty, alums, and guests, all day in the review spaces |
|
|
|